NTPC commissions Barh Thermal Power Station Stage-I

22 November 2021

NTPC Ltd has announced that Unit-1 (660 MW) of Barh Super Thermal Power Station Stage-I (3x660 MW) has commenced the Commercial Operation.

With this, the commercial capacity of NTPC and NTPC group will become 54232.5 MW and 67657.5 MW respectively.